Class 1 Nickel announces the completion of phase 1 drilling at the Somanike Project (Marbridge Mine), near Val-d’Or, Quebec.

In this article:
Class 1 Nickel and Technologies LimitedClass 1 Nickel and Technologies Limited
Class 1 Nickel and Technologies Limited

Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.

Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.
Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.

Figure 2: Completed drilling at Marbridge.

Figure 2: Completed drilling at Marbridge.Figure 2: Completed drilling at Marbridge.
Figure 2: Completed drilling at Marbridge.

Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.

Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.
Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.

Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.

Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.
Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.

TORONTO, Feb. 08, 2023 (GLOBE NEWSWIRE) -- Class 1 Nickel and Technologies Ltd. (CSE: NICO/OTCQB: NICLF) ("Class 1 Nickel" or the "Company") is pleased to announce the completion of 40 drill holes (16,510m) on its Somanike Nickel-Copper Project (“Somanike”), located near Val-d’Or, Quebec (Canada). Assays are pending for all drill holes and are expected in Q1 2023.

Key Points:

  • Diamond drilling has intersected sulphide mineralization in 23 drill holes. Mineralization is within and, in close proximity to ultramafic rocks. The host rocks are komatiitic flows and can be correlated with the horizons in the mine sequences at Mine 1, Mine 2, Mine 3 and Mine 4.

  • Drilling has confirmed that Mine 1 is in a separate stratigraphic/structural sequence from Mine 2, Mine 3 and Mine 4 that are in the hanging wall to Mine 1.

  • Down hole time domain (BHEM) geophysical surveys on holes drilled to date have identified multiple off-hole anomalies for follow-up.

  • Drone mag and LIDAR surveys have been completed over the main Marbridge area. These have identified magnetic trends that demonstrate both definition of known nickel-bearing ultramafic rocks and the significant continuation of ultramafic rocks into under-explored areas.

The Company’s primary objective is to make a major discovery of high-grade magmatic nickel sulphides in an environment of known nickel mineralization with significant opportunity for new discoveries.

Figure 1
Figure 1

Figure 1. Location of the Somanike Project near the city of Val-d’Or, Quebec.

Figure 2
Figure 2

Figure 2: Completed drilling at Marbridge.

Figure 3
Figure 3

Figure 3: A 3D overview of the drill holes completed in phase 1 with modelled mineralized zones.

Figure 4
Figure 4

Figure 4: A plan view of the drill holes completed to date with 2nd Vertical Derivative DroneMAG background.

David Fitch, President & CEO, stated, “We are very pleased to have completed comprehensive drilling both below and adjacent to the four historical mines at Marbridge. The application of modern borehole geophysics has successfully demonstrated its viability in targeting sulphide mineralization. We know from the drilling to date that we are in a very fertile geological environment with abundant ultramafic rocks that host sulphide mineralization”.

The drill program was conducted by Forage GeoNord from Dolbeau-Mistassini, Québec and Forage LaMontagne Fortier from Rouyn-Noranda, Québec, under the supervision of ABG Exploration Inc. (Alex Belo Géologue Inc.) of Laval, Québec.

Table 1: Drill hole locations (NAD 83, Zone 17).

Hole Name

Easting

Northing

Elevation

Length

Azimuth

Dip

NICO22-013

707857.00

5358682.68

314.86

397.00

215.00

-55.00

NICO22-014

708238.11

5358605.70

315.50

834.00

210.00

-70.00

NICO22-015

708640.74

5358525.81

319.31

585.00

200.00

-67.00

NICO22-016

708634.16

5358530.08

319.97

615.00

0.00

-45.00

NICO22-017

706939.67

5359108.07

314.66

446.00

260.00

-70.00

NICO22-018

706934.49

5359109.10

315.17

288.00

317.00

-65.00

NICO22-019

706933.92

5359107.09

314.89

483.00

220.00

-65.00

NICO22-020

706938.78

5359161.43

315.69

318.00

20.00

-50.00

NICO22-021

708634.37

5358528.97

319.59

192.00

0.00

-55.00

NICO22-022

708000.46

5358758.78

320.41

303.00

235.00

-45.00

NICO22-023

708634.39

5358528.77

319.64

352.00

0.00

-60.00

NICO22-024

708596.44

5358660.78

316.54

455.00

195.00

-50.00

NICO22-025

707964.72

5358725.67

319.78

37.00

215.00

-45.00

NICO22-026

707964.91

5358725.90

319.70

36.00

215.00

-60.00

NICO22-027

707950.59

5358722.17

319.73

150.00

215.00

-65.00

NICO22-028

707949.94

5358722.43

319.61

153.00

285.00

-65.00

NICO22-029

707977.17

5358853.69

324.26

660.00

215.00

-50.00

NICO22-030

708636.95

5358704.12

319.80

357.00

195.00

-50.00

NICO22-031

708772.78

5358700.69

317.24

321.00

200.00

-55.00

NICO22-032

708344.88

5358764.27

317.41

585.00

190.00

-60.00

NICO22-033

708772.74

5358700.49

317.35

426.00

200.00

-45.00

NICO22-034

708772.86

5358700.87

317.20

486.00

200.00

-65.00

NICO22-035

708772.97

5358701.30

317.30

423.00

235.00

-60.00

NICO22-036

708344.85

5358763.58

317.54

603.00

200.00

-45.00

NICO22-037

708213.24

5358869.09

320.12

539.00

230.00

-60.00

NICO22-038

708772.87

5358700.62

317.32

666.00

160.00

-65.00

NICO22-039

708566.69

5358779.82

317.47

495.00

180.00

-50.00

NICO22-040

708908.90

5358455.08

314.80

21.00

195.00

-45.00

NICO22-041

708921.88

5358451.24

314.82

34.20

195.00

-60.00

NICO22-042

708921.87

5358451.62

314.72

46.00

195.00

-85.00

NICO22-043

709088.83

5358493.44

314.79

594.00

210.00

-45.00

NICO22-044

709090.17

5358493.96

314.82

398.00

260.00

-65.00

NICO22-045

709089.56

5358492.49

314.80

492.00

200.00

-50.00

NICO22-046

708596.44

5358661.82

316.73

708.00

250.00

-67.00

NICO22-047

708486.46

5358619.81

317.93

444.00

227.00

-55.00

NICO22-048

708600.39

5358667.17

316.69

749.00

215.00

-70.00

NICO22-049

708597.79

5358663.77

316.98

741.00

295.00

-80.00

NICO22-050

708490.18

5358850.98

317.78

606.00

210.00

-62.00

NICO22-051

708950.90

5358709.54

314.75

501.00

200.00

-50.00

NICO22-052

709222.15

5358449.23

310.65

201.00

20.00

-50.00

About Somanike Project

The Somanike Project consists of 148 mining titles (mining rights area) covering 6,882 hectares within a large NW-trending ultramafic complex within the Abitibi Greenstone Belt that hosts several nickel sulphide occurrences, recognized nickel targets, ultramafic trends, and geophysical anomalies. The project is located in the prolific and mining-friendly Abitibi region of northwestern Quebec approximately 25 km north of the mining centre at Malartic, 40 km northwest of Val-d’Or, and 60 km east of Rouyn-Noranda.

The Somanike Project includes Quebec’s first nickel mine, the historical Marbridge Mine, which was a high-grade nickel mine operated by Falconbridge Nickel. The Marbridge Mine occurs within a large NW-trending deformed and altered ultramafic complex. The Falconbridge Nickel reported production of 702,366 tons grading 2.28% Ni and 0.10% Cu from 1962 to 1968, prior to being placed on care and maintenance in 1968. The Mine consisted of two shafts accessing four separate mineralized zones over a combined strike length of 1000 m. The mineralized material was trucked 25 km south and processed at the Canadian Malartic plant. Since 1968, leading groups have reviewed Marbridge data and reports and unanimously concluded that mining ceased in mineralization and the four nickel sulphide zones remain open to expansion by drilling along strike and down-dip/plunge.

Qualified Person

The technical information in this news release has been reviewed and approved by Alexandr Beloborodov (P.Geo.), geological consultant of the Company, who is a Qualified Person under the definitions established by National Instrument 43‐101.

About Class 1 Nickel

Class 1 Nickel and Technologies Limited (CSE: NICO/OTCQB: NICLF) is a Mineral Resource Company focused on the exploration and development of its 100% owned Somanike komatiite hosted nickel-copper sulphide project in Quebec, which includes the historical Marbridge Mine. The Company also owns the Alexo-Dundonald Project, a portfolio of komatiite-hosted magmatic nickel-copper-cobalt sulphide deposits located near Timmins, Ontario.

For more information, please contact:

Mr. David Fitch, President & CEO
T: +61 400 631 608
E: dfitch@class1nickel.com

For additional information please visit our website at www.class1nickel.com and our Twitter feed: @Class1Nickel.

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of this press release.

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks involved in the mineral exploration and development industry, including those risks set out in the Company’s management’s discussion and analysis as filed under the Company’s profile at www.sedar.com. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including that all necessary governmental and regulatory approvals will be received as and when expected. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/3af71a6b-64a2-48e2-a23d-e7139e17ea78

https://www.globenewswire.com/NewsRoom/AttachmentNg/e8713718-0bbd-401e-9785-446439342846

https://www.globenewswire.com/NewsRoom/AttachmentNg/fd2b9be0-4df3-4e2e-b822-7e93ea16641e

https://www.globenewswire.com/NewsRoom/AttachmentNg/f3e16a3a-8ce6-4bc8-a0cc-1785caa62c69


Advertisement